# Round 10 - GMC Call For Grant Applications - Deadline is March 10

**URL:** <https://dao.rocketpool.net/t/round-10-gmc-call-for-grant-applications-deadline-is-march-10/2719>\
**Category:** Grants / Bounties\
**Tags:** gmc\_round\_10, gmc\_grant\_apps\
**Created:** [12 February 2024 14:23 UTC](https://dao.rocketpool.net/t/round-10-gmc-call-for-grant-applications-deadline-is-march-10/2719 "2024-02-12T14:23:49Z")\
**Posts on this page:** 1\
**Showing post:** 5

<div class="post-metadata">

**Author:** ![ShfRyn](https://dao.rocketpool.net/user_avatar/dao.rocketpool.net/shfryn/32/531_2.png) [@ShfRyn](https://dao.rocketpool.net/u/ShfRyn)\
**Post date:** [8 March 2024 23:59 UTC](https://dao.rocketpool.net/t/round-10-gmc-call-for-grant-applications-deadline-is-march-10/2719/5 "2024-03-08T23:59:55Z")

</div>

## Sleety Graphic Design

### What is the work being proposed?

Designing 5 banners for the recently approved [beaconcha.in advertising grant](https://dao.rocketpool.net/t/round-9-gmc-call-for-grant-applications-deadline-is-february-11/2633/4). The sizes for the banners are:

- 320x90
- 590x90
- 760x90
- 970x90
- 1370x90

### Is there any related work this builds off of?

Having a skilled graphic designer should increase the effectiveness of the beaconcha.in advertising campaign the GMC is funding. The campaign intends to promote new node operators.

### Which other non-RPL protocols, DAOs, projects, or individuals, would stand to benefit from this grant?

N/A

## Work

### Who is doing the work?

Sleety

### What is the background of the person(s) doing the work? What experience do they have with such projects in the past?

They have designed many professional design materials for Rocket Pool in the past.

### What is the breakdown of the proposed work, in terms of milestones and/or deadlines?

Upon completion of the work the GMC will you for the beaconcha.in advertising.

### How is the work being tested? Is testing included in the schedule?

The GMC will coordinate a thread and will confirm the content within the banner before Sleety works on the project.

## Costs

$300

### What is the acceptance criteria?

5 properly sized banners that the GMC verifies the quality of.

### What is the proposed payment schedule for the grant? How much USD $ and over what period of time is the applicant requesting?

$300 upon verification of quality from the GMC

### Is the applicant requesting RPL or LUSD?

RPL

### How will the GMC verify that the work delivered matches the proposed cadence?

The GMC administrator has a background in graphic design and the work will also be presented to the marketing subcommittee.

## Conflict of Interest

### Does the person or persons proposing the grant have any conflicts of interest to disclose? (Please disclose here if you are a member of the GMC or if any member of the GMC would benefit directly financially from the grant).

Sleety is not a member of the GMC. The GMC administrator is submitting the grant on his behalf after negotiations with him. The GMC displayed an interest in Sleety creating the graphics for the beaconcha.in advertising.

### Will the recipient of the grant, or any protocol or project in which the recipient has a vested interest (other than Rocket Pool), benefit financially if the grant is successful?

No

---

_[View the full topic](https://dao.rocketpool.net/t/round-10-gmc-call-for-grant-applications-deadline-is-march-10/2719)._
